• Transportation Research Board

      TRB 97th Annual Meeting

      January 7–11, 2018

    • Interactive Program

2018

Annual Meeting Event Detail




Lectern Session 616

Bridge Sliding: ABC Method to Reduce Construction Time

Tuesday 1:30 PM- 3:15 PM
Sign in to reveal location
Lectern
Michael LaViolette, HDR, presiding
Sponsored by:
Standing Committee on Construction of Bridges and Structures (AFH40)
Subcommittee on Accelerated Bridge Construction (AFF00(2))
Standing Committee on Steel Bridges (AFF20)
Standing Committee on Concrete Bridges (AFF30)

The use of slide-in bridge construction (SIBC) is rapidly growing in popularity among bridge owners, designers, and contractors. The session will highlight three case studies in which SIBC has been successfully utilized to save construction time, reduce traffic impacts, and provide a safer work environment.  The final speaker will provide an overview of the SIBC guidance and reference manuals developed by FHWA and FHWA research partners.



No agenda available

Title Presentation Number
I-84 Dingle Road Bridge Slide-In Construction
Bala Sivakumar, HNTB Corporation
P16-0086
CSX Longitudinal and Transverse Rail Bridge Slide
Jonathan Winer, HDR
P16-0087
Low-Tech Bridge Slide for Gila Indian Reservation
Mark Chase, Aztec Engineering, Inc.
Show Abstract
P16-0088
FHWA Slide-In Bridge Construction Guidance
Finn Hubbard, Fish & Associates, Inc.
P16-0085